Copyright © 2004, Tjernlund Products, Inc. All rights reserved P/N 8504117THIS VENT SYSTEM HAS BEEN LISTED FOR USE WITH SPECIFIEDRHEEM, RUUD, WEATHER
9INSTALLING PLENUMDepending on building construction, it may benecessary to notch out a section of the floor joistto provide proper clearance for the
10INSTALLATION OF WALL SUPPORT BRACKET1. To prevent damage to the SS1-R, temporarily support the bottom of the plenum (prop on ladder) while assemblin
VENT PIPE INLET COLLAR CONVERSION1. Remove the plug from rear inlet port by unfastening the 6 nuts that secure it to the Plenum. Keep the plug &
ELECTRICAL WIRING OF SS1-R ON OIL EQUIPMENTAll wiring from the SS1-R to the appliance must be appropriate Class 1 wiring as follows: installed in rigi
13existing wiring and components are not damaged. The four wires connecting the Rheem, Ruud or Weatherking oil fired furnace tothe SS1-R must be rou
SEQUENCE OF OPERATIONS WITH SS1-R POWER SIDEWALL VENTER INSTALLED ONRHEEM, RUUD, OR WEATHERKING OIL-FIRED FURNACES.When the thermostat calls for heat,
COMBUSTION AIRAdequate combustion air is vital for proper combustion and for safe venting. Likewise, for proper SS1-R performance, adequatecombustion
Draft Adjustment: The SS1-R Draft Adjustment, located outdoors on the Vent Hood, has two functions: A) It allows the installer toadjust the amount of
CHECKING MEMORY FOR LAST FAULT CODE IMPORTANT: Prior to accessing the fault code memory, note the settings of the dip switches so that they can be ret
Yes, LED #2 (Green) lights up: The Fan Proving switch may not be closing, SS1-R High Limit may be tripped, wiring connectionsare incorrect/broken or
1TABLE OF CONTENTSPage (s)Description and Specifications ...
WHEEL REPLACEMENT (DIAGRAM T)1. Loosen set screw from wheel hub by using a 5/32” allen wrench.2. Twist wheel to loosen and pull off of motor shaft.
2GENERAL INFORMATIONThese units have been factory tested and rated in accordance with AMCA standard 210, Test Code for Air Moving Devices andalso rate
The following steps should be followed in making the safety inspection:1. Visually inspect the venting system and determine there is no blockage or r
SS1-R WITH INTEGRAL UC1 UNIVERSAL CONTROL BOARD FEATURES# 1. Power supplied by board. Do not supply power to this area or control damage may result.#
5PLENUM AND VENT HOOD CLEARANCE FROM COMBUSTIBLESWith an inlet flue gas temperature of 575oF or below, the SS1-R has been Listed for the following cle
VENT HOOD TERMINATTERMINATION CLEARANCES FOR CANADIAN INSTALLATIONSThe SS1-R has been CSA Listed according to the requirements of “Mechanical Flue-Ga
7INSTALLATION• Reciprocating Saw • 1/2", 7/16",5/8" Wrench • Vent Pipe• Drill and 1/8", 1/4", 1/2" Bits, 1” hole saw • 1
82. Using 1/2" bit, drill pilot holes noted on each side of the template from inside through rim-joist, wall board, siding, etc., keeping drill b
Komentáře k této Příručce